Mackintosh School of Architecture
/ MSA Stage 3
/ Ailsa Carrigan
/ Caerlaverock Castle: Construction Hub (2025)
Caerlaverock Castle: Construction Hub (2025)
Three stages of construction extend the composition of the ruins through time and space. Strategically placed walkways define spaces and complete the desired path around the castle at first-floor level. Circulation is dynamic and rounded, shaped by views and position in the landscape. The castle becomes a Construction Hub, upskilling learners in stone construction through their building of a multi-purpose extension hall. Local sandstone is celebrated. The centre expands with habitation and use, yet remains sensitive to the historic site.
Construction Lifetime
Plan
First floor plan
Concept
Self-build process
Competition boards