School of Design / Interior Design / Zoe Dowman / Reworking the Existing

Reworking the Existing

The building comprises of three floors and a basement. However, this proposal does not fully utilise the third floor, which is reserved for future development. Currently, it accommodates building services, including new tanks for rainwater harvesting, and provides access to the roof, allowing for the integration of solar panels and a green roof.

Creating a welcoming, open building has been a key driver in the design, with sustainability considered throughout. Energy performance is improved through the enlargement of windows, maximising natural daylight, while solar glass has been used to maintain internal temperatures. Alongside the introduction of solar panels, a green roof and rainwater harvesting. Opening up access from the street through to the courtyard creates a clear flow through the building, activating the lane and introducing an additional performance space

Proposed Design
Proposed Sauchiehall Street